Selected work
Public-water infrastructure across New Jersey.
From the NHSA PURAC bypass to the Boonton Reservoir gravity feed. From Newark CSO compliance to a 150-year-flood-design floodwall on an active NJ Transit corridor. The portfolio that backs the phone number — self-performed for New Jersey authorities since 1977.

Wastewater
NHSA PURAC System Upgrade
Temporary 20 MGD wastewater bypass and process upgrades. Sand removal, FRP backwash piping, sludge piping replacement, and chemical-feed diversion. All without taking the PURAC plant offline.

Wastewater
Claystreet CSO Facility
Combined Sewer Overflow solids and floatables control facility. Site work, hazardous-soil excavation, 16″ water main modifications, and mechanical bar screen installation. Debris transport coordinated with Passaic Valley Sewerage Commission.

Water
Boonton Reservoir Rehabilitation
Reservoir rehabilitation and gravity-feed system. Steel piping manifold demolition and rebuild, 84″ gravity pipeline installation, 72″ bypass line, and rapid-mix chamber with chemical-feed system. Designed to mitigate ~$500K annual electric load.

Engineering · Wastewater
Green Brook Flood Control
Two miles of $30M+ flood-control infrastructure designed for the 150-year flood event. R2 levee, R2 concrete floodwall, R2 pump station, railroad closure structure, and diversion culvert. 200,000 cubic yards moved alongside an active NJ Transit railway.

Water
Orange Treatment Plant
Mountain Well improvements and Chestnut Street pump station replacement. Five potable production wells in South Mountain Reservation, ~3.1 MGD average. New treatment facility, pump station, automation. 35′-deep streambed well required dewatering and carbon filtration.
Get in touch
Public-works projects are relationship work. The fastest path to a conversation is the phone. A procurement officer or utility director who wants real answers gets them quickly.